FL Queue Project 442 — Solar in Manatee, Florida

FL Queue Project 442 — Solar in Manatee, Florida is a 74.5 MW solar interconnection project in Manatee, Florida with a current status of withdrawn. It is proposed to connect at Keentown-Manatee 230kV.

74.5 MWCapacity
WithdrawnStatus
FLMarket
SolarTechnology

Project facts

Canonical nameFL Queue Project 442 — Solar in Manatee, Florida
Queue ID442
Statuswithdrawn
Source statusWithdrawn
MarketFL
TechnologySolar
Capacity74.5 MW
StateFlorida
CountyManatee
Point of interconnectionKeentown-Manatee 230kV
Requested (queue) date2022-03-02
Proposed in-service date2026-01-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerFlorida Power & Light

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: fpl-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata