FL Queue Project 444 — Solar in St. Lucie, Florida

FL Queue Project 444 — Solar in St. Lucie, Florida is a 74.5 MW solar interconnection project in St. Lucie, Florida with a current status of operational. It is proposed to connect at Northern St. Lucie County.

74.5 MWCapacity
OperationalStatus
FLMarket
SolarTechnology

Project facts

Canonical nameFL Queue Project 444 — Solar in St. Lucie, Florida
Queue ID444
Statusoperational
Source statusIn-Service
MarketFL
TechnologySolar
Capacity74.5 MW
StateFlorida
CountySt. Lucie
Point of interconnectionNorthern St. Lucie County
Requested (queue) date2022-04-06
Proposed in-service date
Operational date2026-04-30
Withdrawn date
Developer
Utility / transmission ownerFlorida Power & Light

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: fpl-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata