FL Queue Project 615 — Battery in Putnam, Florida

FL Queue Project 615 — Battery in Putnam, Florida is a 100.0 MW battery interconnection project in Putnam, Florida with a current status of active. It is proposed to connect at Putnam Plant.

100.0 MWCapacity
ActiveStatus
FLMarket
BatteryTechnology

Project facts

Canonical nameFL Queue Project 615 — Battery in Putnam, Florida
Queue ID615
Statusactive
Source statusIn Queue
MarketFL
TechnologyBattery
Capacity100.0 MW
StateFlorida
CountyPutnam
Point of interconnectionPutnam Plant
Requested (queue) date2024-01-08
Proposed in-service date2027-01-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerFlorida Power & Light

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: fpl-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata