FL Queue Project 625 — Battery in Indian River, Florida

FL Queue Project 625 — Battery in Indian River, Florida is a 100.0 MW battery interconnection project in Indian River, Florida with a current status of withdrawn. It is proposed to connect at Southeast Indian River County.

100.0 MWCapacity
WithdrawnStatus
FLMarket
BatteryTechnology

Project facts

Canonical nameFL Queue Project 625 — Battery in Indian River, Florida
Queue ID625
Statuswithdrawn
Source statusWithdrawn
MarketFL
TechnologyBattery
Capacity100.0 MW
StateFlorida
CountyIndian River
Point of interconnectionSoutheast Indian River County
Requested (queue) date2024-01-08
Proposed in-service date2032-01-31
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerFlorida Power & Light

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_project—withdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-10-12

Provenance: fpl-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata