FL Queue Project 7 — Gas in an unlisted county, Florida

FL Queue Project 7 — Gas in an unlisted county, Florida is a 1.0 MW gas interconnection project with a current status of operational. It is proposed to connect at Trenton.

1.0 MWCapacity
OperationalStatus
FLMarket
GasTechnology

Project facts

Canonical nameFL Queue Project 7 — Gas in an unlisted county, Florida
Queue ID7
Statusoperational
Source statusCompleted and unit in-service.
MarketFL
TechnologyGas
Capacity1.0 MW
StateFlorida
County
Point of interconnectionTrenton
Requested (queue) date2012-08-27
Proposed in-service date
Operational date2012-12-01
Withdrawn date
Developer
Utility / transmission ownerSeminole Electric Cooperative

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: seminole-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata