FL Queue Project 8 — Gas in an unlisted county, Florida
FL Queue Project 8 — Gas in an unlisted county, Florida is a 180.0 MW gas interconnection project with a current status of active. It is proposed to connect at Hardee Power Station Switchyard.
180.0 MWCapacity
ActiveStatus
FLMarket
GasTechnology
Project facts
| Canonical name | FL Queue Project 8 — Gas in an unlisted county, Florida |
|---|---|
| Queue ID | 8 |
| Status | active |
| Source status | Study complete and presented to customer on 04/13/2013. |
| Market | FL |
| Technology | Gas |
| Capacity | 180.0 MW |
| State | Florida |
| County | — |
| Point of interconnection | Hardee Power Station Switchyard |
| Requested (queue) date | 2013-02-14 |
| Proposed in-service date | 2015-06-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Seminole Electric Cooperative |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | active | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: seminole-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata