FL Queue Project 8 — Gas in an unlisted county, Florida

FL Queue Project 8 — Gas in an unlisted county, Florida is a 180.0 MW gas interconnection project with a current status of active. It is proposed to connect at Hardee Power Station Switchyard.

180.0 MWCapacity
ActiveStatus
FLMarket
GasTechnology

Project facts

Canonical nameFL Queue Project 8 — Gas in an unlisted county, Florida
Queue ID8
Statusactive
Source statusStudy complete and presented to customer on 04/13/2013.
MarketFL
TechnologyGas
Capacity180.0 MW
StateFlorida
County—
Point of interconnectionHardee Power Station Switchyard
Requested (queue) date2013-02-14
Proposed in-service date2015-06-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerSeminole Electric Cooperative

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_project—activehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-10-12

Provenance: seminole-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata