FL Queue Project 9 — Gas in an unlisted county, Florida
FL Queue Project 9 — Gas in an unlisted county, Florida is a 3.2 MW gas interconnection project with a current status of withdrawn. It is proposed to connect at New River (Water Oak).
3.2 MWCapacity
WithdrawnStatus
FLMarket
GasTechnology
Project facts
| Canonical name | FL Queue Project 9 — Gas in an unlisted county, Florida |
|---|---|
| Queue ID | 9 |
| Status | withdrawn |
| Source status | Withdrawn |
| Market | FL |
| Technology | Gas |
| Capacity | 3.2 MW |
| State | Florida |
| County | — |
| Point of interconnection | New River (Water Oak) |
| Requested (queue) date | 2013-07-17 |
| Proposed in-service date | 2014-03-15 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Seminole Electric Cooperative |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: seminole-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.