FL Queue Project JEA-Q007-PV — Solar in Duval, Florida

FL Queue Project JEA-Q007-PV — Solar in Duval, Florida is a 50.0 MW solar interconnection project in Duval, Florida with a current status of active. It is proposed to connect at Dinsmore Sub.

50.0 MWCapacity
ActiveStatus
FLMarket
SolarTechnology

Project facts

Canonical nameFL Queue Project JEA-Q007-PV — Solar in Duval, Florida
Queue IDJEA-Q007-PV
Statusactive
Source status
MarketFL
TechnologySolar
Capacity50.0 MW
StateFlorida
CountyDuval
Point of interconnectionDinsmore Sub
Requested (queue) date2017-12-21
Proposed in-service date2026-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerJEA

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: jea-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.