FL Queue Project JEA-Q010 — Solar+Battery in Duval, Florida
FL Queue Project JEA-Q010 — Solar+Battery in Duval, Florida is a 74.9 MW solar+battery interconnection project in Duval, Florida with a current status of active. It is proposed to connect at Miller.
74.9 MWCapacity
ActiveStatus
FLMarket
Solar+BatteryTechnology
Project facts
| Canonical name | FL Queue Project JEA-Q010 — Solar+Battery in Duval, Florida |
|---|---|
| Queue ID | JEA-Q010 |
| Status | active |
| Source status | — |
| Market | FL |
| Technology | Solar+Battery |
| Capacity | 74.9 MW |
| State | Florida |
| County | Duval |
| Point of interconnection | Miller |
| Requested (queue) date | 2024-05-09 |
| Proposed in-service date | 2026-12-31 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | JEA |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | active | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: jea-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata