Flagstaff - Glen Canyon 345 (2023-G5.2)

Flagstaff - Glen Canyon 345 is a 500.0 MW solar interconnection project in Coconino County, Arizona with a current status of withdrawn. It is proposed to connect at Flagstaff - Glen Canyon 345.

500.0 MWCapacity
WithdrawnStatus
AZMarket
SolarTechnology

Project facts

Canonical nameFlagstaff - Glen Canyon 345
Queue ID2023-G5.2
Statuswithdrawn
Source statusWITHDRAWN
MarketAZ
TechnologySolar
Capacity500.0 MW
StateArizona
CountyCoconino County
Point of interconnectionFlagstaff - Glen Canyon 345
Requested (queue) date2023-06-21
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerWAPA/BEPC/HCPD Integrated System

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; wapa-rm-oasis. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata