Flat Top Solar (AF2-307)
Flat Top Solar is a 64.2 MW solar interconnection project in Bath, Kentucky with a current status of withdrawn. It is proposed to connect at Hope-Belvins Valley Tap 69 kV.
64.2 MWCapacity
WithdrawnStatus
PJMMarket
SolarTechnology
Project facts
| Canonical name | Flat Top Solar |
|---|---|
| Queue ID | AF2-307 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | PJM |
| Technology | Solar |
| Capacity | 64.2 MW |
| State | Kentucky |
| County | Bath |
| Point of interconnection | Hope-Belvins Valley Tap 69 kV |
| Requested (queue) date | 2020-03-30 |
| Proposed in-service date | 2023-09-01 |
| Operational date | — |
| Withdrawn date | 2025-11-03 |
| Developer | Flat Top Solar Project, LLC |
| Utility / transmission owner | EKPC |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata