Flatiron (518_3)

Flatiron is a 8.5 MW battery interconnection project in Larimer, Colorado with a current status of operational.

8.5 MWCapacity
OperationalStatus
WACMMarket
BatteryTechnology

Project facts

Canonical nameFlatiron
Queue ID518_3
Statusoperational
Source status(OP) Operating
MarketWACM
TechnologyBattery
Capacity8.5 MW
StateColorado
CountyLarimer
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date1954-05-01
Withdrawn date
Developer
Utility / transmission ownerU S Bureau of Reclamation

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata