FLIFER Solar I (24INR0538)

FLIFER Solar I is a 84.0 MW solar interconnection project in Ward, Texas with a current status of operational. It is proposed to connect at Tap 138 kV Yucca Drive Switch (bus# 1009) – Sand Tank (bus# 11197).

84.0 MWCapacity
OperationalStatus
WardMarket
SolarTechnology

Project facts

Canonical nameFLIFER Solar I
Queue ID24INR0538
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketWard
TechnologySolar
Capacity84.0 MW
StateTexas
CountyWard
Point of interconnectionTap 138 kV Yucca Drive Switch (bus# 1009) – Sand Tank (bus# 11197)
Requested (queue) date2023-03-08
Proposed in-service date
Operational date2027-04-15
Withdrawn date
DeveloperFLIFER LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata