Flint 138 kv (J3242)

Flint 138 kv is a 150.0 MW battery interconnection project in Tazewell, Illinois with a current status of withdrawn. It is proposed to connect at Flint 138 kv.

150.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameFlint 138 kv
Queue IDJ3242
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity150.0 MW
StateIllinois
CountyTazewell
Point of interconnectionFlint 138 kv
Requested (queue) date2024-04-17
Proposed in-service date2028-06-30
Operational date2028-06-30
Withdrawn date2025-05-05
Developer
Utility / transmission ownerAMEREN ILLINOIS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.