Flint River 780 MW Unit (GI-198)

Flint River 780 MW Unit is a 780.0 MW gas interconnection project in Mitchell County, Georgia with a current status of active. It is proposed to connect at Raccoon Creek Substation.

780.0 MWCapacity
ActiveStatus
GAMarket
GasTechnology

Project facts

Canonical nameFlint River 780 MW Unit
Queue IDGI-198
Statusactive
Source statusExecuted IA - NTP
MarketGA
TechnologyGas
Capacity780.0 MW
StateGeorgia
CountyMitchell County
Point of interconnectionRaccoon Creek Substation
Requested (queue) date2024-10-09
Proposed in-service date2028-08-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Transmission

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: gtc-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata