Flint River BESS (IC-991)

Flint River BESS is a 400.0 MW solar interconnection project in Decatur County, Georgia with a current status of operational.

400.0 MWCapacity
OperationalStatus
GAMarket
SolarTechnology

Project facts

Canonical nameFlint River BESS
Queue IDIC-991
Statusoperational
Source status
MarketGA
TechnologySolar
Capacity400.0 MW
StateGeorgia
CountyDecatur County
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Power

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata