Flurry Gas 1 (29INR0305)
Flurry Gas 1 is a 109.8 MW gas interconnection project in Midland, Texas with a current status of operational. It is proposed to connect at Tap 345 kV 1185 Midland County Northwest Switch (bus #1185) – Midland East (bus #1021) 345 kV Line Ckt 01.
109.8 MWCapacity
OperationalStatus
MidlandMarket
GasTechnology
Project facts
| Canonical name | Flurry Gas 1 |
|---|---|
| Queue ID | 29INR0305 |
| Status | operational |
| Source status | SS Completed, FIS Started, No IA |
| Market | Midland |
| Technology | Gas |
| Capacity | 109.8 MW |
| State | Texas |
| County | Midland |
| Point of interconnection | Tap 345 kV 1185 Midland County Northwest Switch (bus #1185) – Midland East (bus #1021) 345 kV Line Ckt 01 |
| Requested (queue) date | 2026-02-25 |
| Proposed in-service date | — |
| Operational date | 2029-04-16 |
| Withdrawn date | — |
| Developer | NET Power LLC |
| Utility / transmission owner | ERCOT |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27
Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata