Flurry Gas 1 (29INR0305)

Flurry Gas 1 is a 109.8 MW gas interconnection project in Midland, Texas with a current status of operational. It is proposed to connect at Tap 345 kV 1185 Midland County Northwest Switch (bus #1185) – Midland East (bus #1021) 345 kV Line Ckt 01.

109.8 MWCapacity
OperationalStatus
MidlandMarket
GasTechnology

Project facts

Canonical nameFlurry Gas 1
Queue ID29INR0305
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketMidland
TechnologyGas
Capacity109.8 MW
StateTexas
CountyMidland
Point of interconnectionTap 345 kV 1185 Midland County Northwest Switch (bus #1185) – Midland East (bus #1021) 345 kV Line Ckt 01
Requested (queue) date2026-02-25
Proposed in-service date
Operational date2029-04-16
Withdrawn date
DeveloperNET Power LLC
Utility / transmission ownerERCOT

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata