Foard City Wind (61402_FOARD)

Foard City Wind is a 352.8 MW wind interconnection project in Foard, Texas with a current status of operational.

352.8 MWCapacity
OperationalStatus
ERCOMarket
WindTechnology

Project facts

Canonical nameFoard City Wind
Queue ID61402_FOARD
Statusoperational
Source status(OP) Operating
MarketERCO
TechnologyWind
Capacity352.8 MW
StateTexas
CountyFoard
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2019-09-01
Withdrawn date
Developer
Utility / transmission ownerFoard City Wind, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata