Fore River CNR Uprate (881)
Fore River CNR Uprate is a 800.0 MW gas interconnection project in Norfolk, Massachusetts with a current status of operational. It is proposed to connect at NSTAR Edgar 115kv substation..
800.0 MWCapacity
OperationalStatus
SEMAMarket
GasTechnology
Project facts
| Canonical name | Fore River CNR Uprate |
|---|---|
| Queue ID | 881 |
| Status | operational |
| Source status | C |
| Market | SEMA |
| Technology | Gas |
| Capacity | 800.0 MW |
| State | Massachusetts |
| County | Norfolk |
| Point of interconnection | NSTAR Edgar 115kv substation. |
| Requested (queue) date | 2019-04-18 |
| Proposed in-service date | — |
| Operational date | 2020-06-01 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | ISO-NE |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata