Forest Creek Wind Repower (25INR0578)

Forest Creek Wind Repower is a 125.1 MW other interconnection project in Glasscock, Texas with a current status of operational. It is proposed to connect at Mcdonald 138 kV (Bus #: 1333).

125.1 MWCapacity
OperationalStatus
GlasscockMarket
OtherTechnology

Project facts

Canonical nameForest Creek Wind Repower
Queue ID25INR0578
Statusoperational
Source statusSS Completed, FIS Completed, IA
MarketGlasscock
TechnologyOther
Capacity125.1 MW
StateTexas
CountyGlasscock
Point of interconnectionMcdonald 138 kV (Bus #: 1333)
Requested (queue) date2024-01-11
Proposed in-service date
Operational date2026-08-15
Withdrawn date
DeveloperForest Creek Wind Farm, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-28

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata