Forest Grove Substation (L0575)

Forest Grove Substation is a 5.0 MW other interconnection project in Morrow, Oregon with a current status of operational. It is proposed to connect at Keeler-Forest Grove No 1 115kV line Keeler-Forest Grove No 2 115kV line.

5.0 MWCapacity
OperationalStatus
ORMarket
OtherTechnology

Project facts

Canonical nameForest Grove Substation
Queue IDL0575
Statusoperational
Source statusENERGIZED
MarketOR
TechnologyOther
Capacity5.0 MW
StateOregon
CountyMorrow
Point of interconnectionKeeler-Forest Grove No 1 115kV line Keeler-Forest Grove No 2 115kV line
Requested (queue) date2023-08-04
Proposed in-service date
Operational date2026-08-22
Withdrawn date
DeveloperCity of Forest Grove
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata