Forman 115kV Substation (J2913)

Forman 115kV Substation is a 90.0 MW battery interconnection project in Sargent, North Dakota with a current status of operational. It is proposed to connect at Forman 115kV Substation.

90.0 MWCapacity
OperationalStatus
Market
BatteryTechnology

Project facts

Canonical nameForman 115kV Substation
Queue IDJ2913
Statusoperational
Source statusActive
Market
TechnologyBattery
Capacity90.0 MW
StateNorth Dakota
CountySargent
Point of interconnectionForman 115kV Substation
Requested (queue) date2022-09-15
Proposed in-service date2025-04-30
Operational date2025-04-30
Withdrawn date
Developer
Utility / transmission ownerMISO

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.