Sargent County, North Dakota — Interconnection Projects

The interXdata warehouse tracks 6 interconnection projects in Sargent, North Dakota, representing 770 MW of requested capacity.

6Total projects
0Active
1Operational
5Withdrawn
770 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Battery5620 MW
Wind1150 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Forman 230 kV SubstationJ3266Battery175.0 MWwithdrawnSargent, North Dakota
Forman 115 kV SubstationGEN-2024-034Battery175.0 MWwithdrawnSargent, North Dakota
MISO Queue Project H088 — Wind in Sargent, North DakotaH088Wind150.0 MWwithdrawnSargent, North Dakota
Forman 230 kV SubstationJ2094Battery100.0 MWwithdrawnSargent, North Dakota
Forman 115kV SubstationJ2913Battery90.0 MWoperationalSargent, North Dakota
Gwinner 115kV SubstationJ2896Battery80.0 MWwithdrawnSargent, North Dakota

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; MISO — generator interconnection queue; Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.