FORREST CITY SOUTH - HUGHES 161.0kV (J3381)

FORREST CITY SOUTH - HUGHES 161.0kV is a 150.9 MW solar interconnection project in St. Francis, Arkansas with a current status of withdrawn. It is proposed to connect at FORREST CITY SOUTH - HUGHES 161.0kV.

150.9 MWCapacity
WithdrawnStatus
—Market
SolarTechnology

Project facts

Canonical nameFORREST CITY SOUTH - HUGHES 161.0kV
Queue IDJ3381
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologySolar
Capacity150.9 MW
StateArkansas
CountySt. Francis
Point of interconnectionFORREST CITY SOUTH - HUGHES 161.0kV
Requested (queue) date2024-04-18
Proposed in-service date2028-01-01
Operational date2028-01-01
Withdrawn date2026-01-07
Developer—
Utility / transmission ownerENTERGY ARKANSAS, LLC EATO

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-09-24phaseStudy Not StartedPhase 2low
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-11-26
Data last materially changed2026-11-26
Page data generated2026-11-26

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.