Fort Bliss (SG-15-6-1)

Fort Bliss is a 20.0 MW solar interconnection project in El Paso, Texas with a current status of withdrawn. It is proposed to connect at Fort Bliss.

20.0 MWCapacity
WithdrawnStatus
WestMarket
SolarTechnology

Project facts

Canonical nameFort Bliss
Queue IDSG-15-6-1
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologySolar
Capacity20.0 MW
StateTexas
CountyEl Paso
Point of interconnectionFort Bliss
Requested (queue) date
Proposed in-service date2016-09-01
Operational date
Withdrawn date2015-11-01
Developer
Utility / transmission ownerEl Paso Electric Company

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.