Fort Calhoun 345kV Substation is a 200.0 MW other interconnection project in Blair, Nebraska with a current status of active. It is proposed to connect at Fort Calhoun 345kV Substation.

200.0 MWCapacity
ActiveStatus
NEMarket
OtherTechnology

Project facts

Canonical nameFort Calhoun 345kV Substation
Queue IDGEN-2025-SR24
Statusactive
Source statusFACILITY STUDY STAGE
MarketNE
TechnologyOther
Capacity200.0 MW
StateNebraska
CountyBlair
Point of interconnectionFort Calhoun 345kV Substation
Requested (queue) date2025-06-12
Proposed in-service date2028-11-30
Operational date
Withdrawn date
Developer
Utility / transmission ownerOPPD

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectactivehigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata