Fort Edward Solar Farm (NY53) (C26-0026)
Fort Edward Solar Farm (NY53) is a 100.0 MW solar interconnection project in Washington, New York with a current status of active. It is proposed to connect at Mohican to Battenkill 115 kV Line #15.
100.0 MWCapacity
ActiveStatus
FMarket
SolarTechnology
Project facts
| Canonical name | Fort Edward Solar Farm (NY53) |
|---|---|
| Queue ID | C26-0026 |
| Status | active |
| Source status | 1 |
| Market | F |
| Technology | Solar |
| Capacity | 100.0 MW |
| State | New York |
| County | Washington |
| Point of interconnection | Mohican to Battenkill 115 kV Line #15 |
| Requested (queue) date | 2026-08-17 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | — |
| Developer | Fort Edward Solar LLC |
| Utility / transmission owner | NM-NG |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-09-12 | new_project | — | active | high |
Explore related data
Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12
Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata