Fort Lyon Solar (70115_GEN1)

Fort Lyon Solar is a 1.8 MW solar interconnection project in Bent, Colorado with a current status of active.

1.8 MWCapacity
ActiveStatus
WACMMarket
SolarTechnology

Project facts

Canonical nameFort Lyon Solar
Queue ID70115_GEN1
Statusactive
Source status(L) Regulatory approvals pending. Not under construction
MarketWACM
TechnologySolar
Capacity1.8 MW
StateColorado
CountyBent
Point of interconnection—
Requested (queue) date—
Proposed in-service date2027-03-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerClay Creek Energy, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-10-02proposed_online_date2027-02-012027-03-01medium
2026-08-02new_project—activehigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata