Fort Rock II (G0526)

Fort Rock II is a 20.0 MW solar interconnection project in Lake, Oregon with a current status of operational. It is proposed to connect at Within 10 miles of Midstate Electric's Fort Rock 115 kV Substation.

20.0 MWCapacity
OperationalStatus
ORMarket
SolarTechnology

Project facts

Canonical nameFort Rock II
Queue IDG0526
Statusoperational
Source statusENERGIZED
MarketOR
TechnologySolar
Capacity20.0 MW
StateOregon
CountyLake
Point of interconnectionWithin 10 miles of Midstate Electric's Fort Rock 115 kV Substation
Requested (queue) date2016-01-28
Proposed in-service date
Operational date2019-04-01
Withdrawn date
DeveloperFort Rock Interconnection II LLC
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.