Fort Rock II (G0526)
Fort Rock II is a 20.0 MW solar interconnection project in Lake, Oregon with a current status of operational. It is proposed to connect at Within 10 miles of Midstate Electric's Fort Rock 115 kV Substation.
20.0 MWCapacity
OperationalStatus
ORMarket
SolarTechnology
Project facts
| Canonical name | Fort Rock II |
|---|---|
| Queue ID | G0526 |
| Status | operational |
| Source status | ENERGIZED |
| Market | OR |
| Technology | Solar |
| Capacity | 20.0 MW |
| State | Oregon |
| County | Lake |
| Point of interconnection | Within 10 miles of Midstate Electric's Fort Rock 115 kV Substation |
| Requested (queue) date | 2016-01-28 |
| Proposed in-service date | — |
| Operational date | 2019-04-01 |
| Withdrawn date | — |
| Developer | Fort Rock Interconnection II LLC |
| Utility / transmission owner | Bonneville Power Administration |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata