Fostoria Central 345 kV (AG2-375 - moved to TC2)

Fostoria Central 345 kV is a 500.0 MW battery interconnection project in Hancock, Ohio with a current status of withdrawn.

500.0 MWCapacity
WithdrawnStatus
—Market
BatteryTechnology

Project facts

Canonical nameFostoria Central 345 kV
Queue IDAG2-375 - moved to TC2
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologyBattery
Capacity500.0 MW
StateOhio
CountyHancock
Point of interconnection—
Requested (queue) date2021-03-29
Proposed in-service date2024-11-15
Operational date—
Withdrawn date2025-07-03
Developer—
Utility / transmission ownerAEP

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-11-26
Data last materially changed2026-11-26
Page data generated2026-11-26

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.