Foundry St. 138kV (W2-004)

Foundry St. 138kV is a 45.0 MW other interconnection project in Essex, New Jersey with a current status of withdrawn.

45.0 MWCapacity
WithdrawnStatus
—Market
OtherTechnology

Project facts

Canonical nameFoundry St. 138kV
Queue IDW2-004
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologyOther
Capacity45.0 MW
StateNew Jersey
CountyEssex
Point of interconnection—
Requested (queue) date2010-05-12
Proposed in-service date2012-09-01
Operational date—
Withdrawn date2012-05-23
Developer—
Utility / transmission ownerPSEG Long Island

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-11-26
Data last materially changed2026-11-26
Page data generated2026-11-26

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.