Fountain Point Solar (AE1-092)

Fountain Point Solar is a 206.6 MW solar interconnection project in Union, Ohio with a current status of active. It is proposed to connect at Blue Jacket-Kirby 138 kV.

206.6 MWCapacity
ActiveStatus
PJMMarket
SolarTechnology

Project facts

Canonical nameFountain Point Solar
Queue IDAE1-092
Statusactive
Source statusactive
MarketPJM
TechnologySolar
Capacity206.6 MW
StateOhio
CountyUnion
Point of interconnectionBlue Jacket-Kirby 138 kV
Requested (queue) date2018-08-31
Proposed in-service date2021-12-31
Operational date
Withdrawn date
DeveloperFountain Point Solar Energy LLC
Utility / transmission ownerDayton

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata