Fountain Point Solar (AE1-092)
Fountain Point Solar is a 206.6 MW solar interconnection project in Union, Ohio with a current status of active. It is proposed to connect at Blue Jacket-Kirby 138 kV.
206.6 MWCapacity
ActiveStatus
PJMMarket
SolarTechnology
Project facts
| Canonical name | Fountain Point Solar |
|---|---|
| Queue ID | AE1-092 |
| Status | active |
| Source status | active |
| Market | PJM |
| Technology | Solar |
| Capacity | 206.6 MW |
| State | Ohio |
| County | Union |
| Point of interconnection | Blue Jacket-Kirby 138 kV |
| Requested (queue) date | 2018-08-31 |
| Proposed in-service date | 2021-12-31 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Fountain Point Solar Energy LLC |
| Utility / transmission owner | Dayton |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata