Frackville - Hauto #3 (R43)

Frackville - Hauto #3 is a 20.0 MW wind interconnection project in Schuylkill, Pennsylvania with a current status of withdrawn.

20.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameFrackville - Hauto #3
Queue IDR43
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity20.0 MW
StatePennsylvania
CountySchuylkill
Point of interconnection
Requested (queue) date2006-11-27
Proposed in-service date2015-06-01
Operational date
Withdrawn date2015-06-15
Developer
Utility / transmission ownerPPL

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.