Frame Switch Energy (14INR0074)

Frame Switch Energy is a 92.0 MW gas interconnection project with a current status of withdrawn. It is proposed to connect at 3673 Taylor-West 138kV.

92.0 MWCapacity
WithdrawnStatus
ERCOTMarket
GasTechnology

Project facts

Canonical nameFrame Switch Energy
Queue ID14INR0074
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologyGas
Capacity92.0 MW
State
County
Point of interconnection3673 Taylor-West 138kV
Requested (queue) date2013-12-09
Proposed in-service date2020-06-30
Operational date
Withdrawn date
DeveloperFrame Switch
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata