Frank Knutson (55505_BR2)

Frank Knutson is a 77.1 MW gas interconnection project in Adams, Colorado with a current status of operational.

77.1 MWCapacity
OperationalStatus
PSCOMarket
GasTechnology

Project facts

Canonical nameFrank Knutson
Queue ID55505_BR2
Statusoperational
Source status(OP) Operating
MarketPSCO
TechnologyGas
Capacity77.1 MW
StateColorado
CountyAdams
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2002-05-01
Withdrawn date
Developer
Utility / transmission ownerTri-State Generation and Transmission Association

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.