Franklin Park 3-SLCHI803 (68136_CH803)

Franklin Park 3-SLCHI803 is a 1.2 MW solar interconnection project in Cook, Illinois with a current status of operational.

1.2 MWCapacity
OperationalStatus
PJMMarket
SolarTechnology

Project facts

Canonical nameFranklin Park 3-SLCHI803
Queue ID68136_CH803
Statusoperational
Source status(OP) Operating
MarketPJM
TechnologySolar
Capacity1.2 MW
StateIllinois
CountyCook
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2025-02-01
Withdrawn date—
Developer—
Utility / transmission ownerPrologis Logistics Services Incorporated

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-11-01
Data last materially changed2026-11-01
Page data generated2026-11-26

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata