Freeport Wind Farm (K04_CE19)

Freeport Wind Farm is a 80.0 MW wind interconnection project in Stephenson, Illinois with a current status of withdrawn.

80.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameFreeport Wind Farm
Queue IDK04_CE19
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity80.0 MW
StateIllinois
CountyStephenson
Point of interconnection
Requested (queue) date2003-04-15
Proposed in-service date2011-10-15
Operational date
Withdrawn date2011-09-26
Developer
Utility / transmission ownerComEd

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata