Fremont Center-Tiffin Center 138 kV circuit #1 (AE2-174)

Fremont Center-Tiffin Center 138 kV circuit #1 is a 198.0 MW wind interconnection project in Seneca, Ohio with a current status of withdrawn.

198.0 MWCapacity
WithdrawnStatus
—Market
WindTechnology

Project facts

Canonical nameFremont Center-Tiffin Center 138 kV circuit #1
Queue IDAE2-174
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologyWind
Capacity198.0 MW
StateOhio
CountySeneca
Point of interconnection—
Requested (queue) date2019-03-19
Proposed in-service date2021-10-31
Operational date—
Withdrawn date2023-02-13
Developer—
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-11-26
Data last materially changed2026-11-26
Page data generated2026-11-26

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata