Fremont Solar (68153_BA1)
Fremont Solar is a 198.0 MW battery interconnection project in Iron, Utah with a current status of active.
198.0 MWCapacity
ActiveStatus
PACEMarket
BatteryTechnology
Project facts
| Canonical name | Fremont Solar |
|---|---|
| Queue ID | 68153_BA1 |
| Status | active |
| Source status | (U) Under construction, less than or equal to 50 percent complete |
| Market | PACE |
| Technology | Battery |
| Capacity | 198.0 MW |
| State | Utah |
| County | Iron |
| Point of interconnection | — |
| Requested (queue) date | — |
| Proposed in-service date | 2027-06-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Fremont Solar, LLC |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-02 | new_project | — | active | high |
Explore related data
Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.