Fresh Air Energy II, LLC (641)

Fresh Air Energy II, LLC is a 200.0 MW battery interconnection project in Power, Idaho with a current status of active. It is proposed to connect at BRDY 230kV Substation.

200.0 MWCapacity
ActiveStatus
IDMarket
BatteryTechnology

Project facts

Canonical nameFresh Air Energy II, LLC
Queue ID641
Statusactive
Source statusConstruction
MarketID
TechnologyBattery
Capacity200.0 MW
StateIdaho
CountyPower
Point of interconnectionBRDY 230kV Substation
Requested (queue) date2022-02-25
Proposed in-service date2024-12-31
Operational date
Withdrawn date
DeveloperFresh Air Energy II, LLC
Utility / transmission ownerIdaho Power Company

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectactivehigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: idahopower-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata