FRESNO COGENERATION CTG-4 (338)

FRESNO COGENERATION CTG-4 is a 10.0 MW gas interconnection project in Fresno, California with a current status of withdrawn. It is proposed to connect at Kerman-Helms 70kV line.

10.0 MWCapacity
WithdrawnStatus
Market
GasTechnology

Project facts

Canonical nameFRESNO COGENERATION CTG-4
Queue ID338
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologyGas
Capacity10.0 MW
StateCalifornia
CountyFresno
Point of interconnectionKerman-Helms 70kV line
Requested (queue) date2008-04-17
Proposed in-service date
Operational date
Withdrawn date2008-11-25
Developer
Utility / transmission ownerPGAE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata