Frito Lay Incorporated is a 4.6 MW gas interconnection project in Windham, Connecticut with a current status of operational.

4.6 MWCapacity
OperationalStatus
ISNEMarket
GasTechnology

Project facts

Canonical nameFrito Lay Incorporated
Queue ID58664_COGEN
Statusoperational
Source status(OP) Operating
MarketISNE
TechnologyGas
Capacity4.6 MW
StateConnecticut
CountyWindham
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2009-03-01
Withdrawn date—
Developer—
Utility / transmission ownerFrito Lay Incorporated Dayville

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-11

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata