FRONTIER SOLAR II (FKA SCATEC WESTSIDE SOLAR RANCH II) (765)

FRONTIER SOLAR II (FKA SCATEC WESTSIDE SOLAR RANCH II) is a 30.0 MW solar interconnection project in Stanislaus, California with a current status of withdrawn. It is proposed to connect at Salado - Newman 60 KV.

30.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameFRONTIER SOLAR II (FKA SCATEC WESTSIDE SOLAR RANCH II)
Queue ID765
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologySolar
Capacity30.0 MW
StateCalifornia
CountyStanislaus
Point of interconnectionSalado - Newman 60 KV
Requested (queue) date2011-03-31
Proposed in-service date
Operational date
Withdrawn date2013-04-26
Developer
Utility / transmission ownerPGAE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata