Fuel Cell CNR (1380)
Fuel Cell CNR is a 20.1 MW other interconnection project in Hartford, Connecticut with a current status of operational. It is proposed to connect at The electrical connection where Eversource's 69 kV 680 line span from pole 2742 connects to the Farmington River Power Company's 680 line at pole 2743's insulator..
20.1 MWCapacity
OperationalStatus
CTMarket
OtherTechnology
Project facts
| Canonical name | Fuel Cell CNR |
|---|---|
| Queue ID | 1380 |
| Status | operational |
| Source status | C |
| Market | CT |
| Technology | Other |
| Capacity | 20.1 MW |
| State | Connecticut |
| County | Hartford |
| Point of interconnection | The electrical connection where Eversource's 69 kV 680 line span from pole 2742 connects to the Farmington River Power Company's 680 line at pole 2743's insulator. |
| Requested (queue) date | 2023-04-06 |
| Proposed in-service date | — |
| Operational date | 2024-12-12 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | ISO-NE |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata