Fuel Cell (885)

Fuel Cell is a 20.2 MW gas interconnection project in Hartford, Connecticut with a current status of withdrawn. It is proposed to connect at Black Rock Substation (Eversource) via the Farmington River Power Company owned Burritt St substation 69kv line 680.

20.2 MWCapacity
WithdrawnStatus
CTMarket
GasTechnology

Project facts

Canonical nameFuel Cell
Queue ID885
Statuswithdrawn
Source statusW
MarketCT
TechnologyGas
Capacity20.2 MW
StateConnecticut
CountyHartford
Point of interconnectionBlack Rock Substation (Eversource) via the Farmington River Power Company owned Burritt St substation 69kv line 680
Requested (queue) date2019-04-25
Proposed in-service date2020-06-30
Operational date
Withdrawn date2019-09-03
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata