Gaia Hybrid (66342_GAIAS)

Gaia Hybrid is a 152.7 MW solar interconnection project in Navarro, Texas with a current status of active.

152.7 MWCapacity
ActiveStatus
ERCOMarket
SolarTechnology

Project facts

Canonical nameGaia Hybrid
Queue ID66342_GAIAS
Statusactive
Source status(OP) Operating
MarketERCO
TechnologySolar
Capacity152.7 MW
StateTexas
CountyNavarro
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerSunraycer Assets I LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectactivehigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata