Gaia Hybrid (66342_GAIAS)
Gaia Hybrid is a 152.7 MW solar interconnection project in Navarro, Texas with a current status of active.
152.7 MWCapacity
ActiveStatus
ERCOMarket
SolarTechnology
Project facts
| Canonical name | Gaia Hybrid |
|---|---|
| Queue ID | 66342_GAIAS |
| Status | active |
| Source status | (OP) Operating |
| Market | ERCO |
| Technology | Solar |
| Capacity | 152.7 MW |
| State | Texas |
| County | Navarro |
| Point of interconnection | — |
| Requested (queue) date | — |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Sunraycer Assets I LLC |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-02 | new_project | — | active | high |
Explore related data
Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata