Gail Mountain Storage (26INR0361)

Gail Mountain Storage is a 152.0 MW battery interconnection project with a current status of withdrawn. It is proposed to connect at Tap 138 kV line 131953 Bull Creek Wind - 1301 Willow Valley.

152.0 MWCapacity
WithdrawnStatus
ERCOTMarket
BatteryTechnology

Project facts

Canonical nameGail Mountain Storage
Queue ID26INR0361
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologyBattery
Capacity152.0 MW
State
County
Point of interconnectionTap 138 kV line 131953 Bull Creek Wind - 1301 Willow Valley
Requested (queue) date2024-02-02
Proposed in-service date2026-07-01
Operational date
Withdrawn date
DeveloperGail Mountain Solar, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata