Galaxy I Solar is a 99.4 MW solar interconnection project in Ellis, Texas with a current status of operational. It is proposed to connect at Stainback Switch (bus #2217) - Elrod Switch (bus #3159) .

99.4 MWCapacity
OperationalStatus
EllisMarket
SolarTechnology

Project facts

Canonical nameGalaxy I Solar
Queue ID28INR0355
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketEllis
TechnologySolar
Capacity99.4 MW
StateTexas
CountyEllis
Point of interconnectionStainback Switch (bus #2217) - Elrod Switch (bus #3159)
Requested (queue) date2025-04-21
Proposed in-service date
Operational date2028-10-30
Withdrawn date
DeveloperGalaxy Solar, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata