Galaxy Storage 2 (28INR0387)

Galaxy Storage 2 is a 201.9 MW other interconnection project in Ellis, Texas with a current status of operational. It is proposed to connect at 3/4-Breaker Ring Bus at 345kV Venus Switch (#1907) BKR 4920 - Navarro Switch (LST) (#68091) BKR 3B3134/3B3127.

201.9 MWCapacity
OperationalStatus
EllisMarket
OtherTechnology

Project facts

Canonical nameGalaxy Storage 2
Queue ID28INR0387
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketEllis
TechnologyOther
Capacity201.9 MW
StateTexas
CountyEllis
Point of interconnection3/4-Breaker Ring Bus at 345kV Venus Switch (#1907) BKR 4920 - Navarro Switch (LST) (#68091) BKR 3B3134/3B3127
Requested (queue) date2025-06-19
Proposed in-service date
Operational date2029-10-30
Withdrawn date
DeveloperGalaxy Solar, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata