Galion 138 kV (AF2-150)

Galion 138 kV is a 88.0 MW solar interconnection project in Morrow, Ohio with a current status of active.

88.0 MWCapacity
ActiveStatus
—Market
SolarTechnology

Project facts

Canonical nameGalion 138 kV
Queue IDAF2-150
Statusactive
Source statusUnder Construction
Market—
TechnologySolar
Capacity88.0 MW
StateOhio
CountyMorrow
Point of interconnection—
Requested (queue) date2020-03-13
Proposed in-service date2027-07-31
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerATSI

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—activehigh

Explore related data

Source last checked2026-10-11
Data last materially changed2026-10-11
Page data generated2026-10-11

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata